Garden Cabin Construction: Spring 2007 /
100_6606
5/10/2007
Construction begins in early spring with installing a drainage system for
natural spring water, and digging for the building foundations. The Garden
Cabins are being constructed on the hill just beyond the lower dome, as
viewed from the Lodge.
|